CUSTOMER SERVICE
RATES/REGULATIONS
FINANCIAL RECORDS
WATER QUALITY
OPEN RECORDS POLICY
OPEN RECORDS REQUEST FORM
CONSERVATION
CURRENT PROJECTS
STANDARD DRAWINGS
SUBDISTRICT INFO
JUST FOR KIDS
EMPLOYMENT
FAQ

 


Construction Updates

Kenton County

Updates are arranged alphabetically by city name.
Click a Title to view a detailed map.

 

Aging Infrastructure and Water Main Replacement

Title City Description Status
Oliver and Cox Water Main Replacement Independence The District will be replacing the water main on Oliver and Cox. Under Design
Buttermilk Pike Villa Hills Buttermilk Pike WMR from Collins Road to Rogers Road Under Design
Hudson Ave Lakeside Park Hudson Avenue WMR from Dixie Highway to Evergreen Court Under Design
Latonia Lakes Latonia Lakes Latonia Lakes WMR – all streets included Under Construction
McHenry Street Newport McHenry Street WMR from Clifton Avenue to Grandview Avenue Under Construction
KY 9 Newport KY 9 watermain interconnect from West 9th to West 6th Street Under Design
Clubhouse Drive & Wedgewood Drive Independence

Clubhouse Drive from Turkeyfoot Road to Pearl Drive
Wedgewood Drive from Bristow Road to Wedgewood Road

Under Design
Dudley Road Edgewood Dudley Road WMR from Dixie Highway to Turkeyfoot Road Under Design
St. Joseph Lane Water Main Replacement Park Hills St. Joseph Lane – WMR from #709 to end of the street Under Design
Dudley Road Edgewood Dudley Road - Abandon an existing 8” water main from Merten Drive to Lee Lane and switch services to 16” water main. Under Design
Edgewood Water Main Replacement Edgewood Beech Road from Dudley Road to the end of the street, Buckner Drive from Dudley Road to Beech Road, Wildrose Drive from Dudley Road to Maple Lane, Elmwood Road from Lyndale Road to house #3117.  This project will include 9475’ of 6”, 8”, & 12” piping. Under Design
Perimeter Drive – Phase 1 Erlanger Perimeter Drive WMR Phase 1 from Stevenson Road to Fieldcrest Drive Under Design
Perimeter Drive – Phase 2 Erlanger Perimeter Drive WMR from Fieldcrest Drive to Arbor Drive Under Design
Church Street and Faye Drive Taylor Mill Faye Drive from Church Street to Winston Avenue and on Church Street from Winston Avenue to a point 165’ east of Faye Street.  This project will include 162’ of 8” piping. Under Design
Latonia Avenue Covington Latonia Avenue WMR from Southern Avenue to West 35th Under Design
Riggs Avenue/Erlanger Road - Phase 2 Erlanger Riggs Avenue from Kirby Court to Erlanger Road and on Erlanger Road from Riggs Avenue to Baker Street Under Design
Madison Pike – 30” & 24” Phase 2 Covington Madison Pike from Dudley Road to Rolling Hills Drive Under Construction
Donaldson Road – 24” corrosion protection retrofit Erlanger Donaldson Road – 24 corrosion protection retrofit – sacrificial anode system Under Design


System Upgrades/Redundancy/Water Main Extensions

Title

City Description Status
Dudley Complex Sodium Hypochlorite Building Erlanger Demolition of the existing building at the Dudley complex and construction of a new building to house the sodium hypochlorite equipment. The project will also include new buried chemical feed piping and electrical connections to the existing pumping station. Under Construction
Dudley Tanks Edgewood Tanks to be painted in the fall of 2016 and 2017. Under Design
36” Concrete Water main Edgewood Replace a portion of a cross country 36” concrete water main Under Design

 



 

If you cannot view the maps,
please visit www.adobe.com and
download the free Adobe Reader.